
Fall & Level Correction
Concrete Screeding in Melbourne
Correct Falls to Drainage Before Waterproofing and Final Finishes
The Fall Decides Where the Water Goes
No waterproofing membrane or coating can fix a floor that drains to the wrong spot. Screeding builds a sloped, level substrate that directs water exactly where it needs to go, before any membrane or finish goes down.
Installation Steps
Set out the drainage point
Lay and level the screed to a consistent fall
Check level and fall before handover
Cure before membrane, tile or coating
Set out the drainage point
Lay and level the screed to a consistent fall
Check level and fall before handover
Cure before membrane, tile or coating
Where Screeding Is Required
Bathrooms and Wet Areas
Correct falls to the waste before tiling and membranes go down.
Balconies and Rooftops
Directing rain water away from doors and towards outlets.
Commercial and Industrial Floors
Levelling and fall correction ahead of coating systems.

Screeding Questions
Why does a floor need screeding before waterproofing?
A membrane only works if water actually reaches the drain. Screeding builds the correct fall into the substrate so water does not pool in the wrong spot.
How long does screeding take to cure?
Cure time depends on the screed product and thickness. We confirm exact timing before any membrane or finish is applied on top.
Can screeding fix an existing floor with the wrong fall?
In many cases yes. We assess the existing slab and re-screed to correct the fall before any new finish goes down.
With 5+ Years Experience
Australian Owned & Operated Business
We use Eco-Friendly Products
Member of Master Builders Victoria
Member of Australian Institute of Waterproofing
With 5+ Years Experience
Australian Owned & Operated Business
We use Eco-Friendly Products
Member of Master Builders Victoria
Member of Australian Institute of Waterproofing
Request a Screeding Quote
Get the falls right before your next finish goes down.
